top of page

Smyth Memorial Building Renovation: Week 7

Writer: Jeff PhilbrickJeff Philbrick

Smyth Memorial Building Renovation Week 7 has gone really well! Progress has not been quite as showy, but super important. The main event has been floor scraping, and many thanks to the volunteers who have put in some time scraping up the old material, preparing the way for the new tile throughout the downstairs. The place is beginning to look nice with a fresh coat of paint. Late in the week, we are seeing progress on the lower entrance walkway, and the installation of the kitchen cabinets. And, the new grass seed is sprouting - yeah! This week we celebrate the $78,184 that has come in thus far; the need is still substantial, and a way to donate is here: https://www.jrhs.org/smb-restoration-fund.



 
 
 

댓글


STAY CONNECTED

GET IN TOUCH

15 Stevens Lane,

PO Box 473

Candia, NH 03034

(603) 483-5664

Contact

Jesse Remington High School admits students of any race, color, national and ethnic origin to all the rights, privileges, programs, and activities generally accorded or made available to students at the school.  JRHS does not discriminate on the basis of race, color, national and ethnic origin in administration of educational policies, admissions policies, scholarship and loan programs, and athletic and other school-administered programs.

© 2023 by Jesse Remington High School

bottom of page